Summary Table of Engineering Project Situation
Project Name | EPC Project of 9000MTM Putty Powder Production Line of XX Cement Company in Pakistan |
Project Address | Pakistan, Mianwali |
Contract signing time | August 10, 2021 |
Project Production Time | May 25th, 2023 |
Project Supply Content | HVM1500X vertical grinding system, pneumatic conveying system, mixing system, and finished product packaging system |
Processing Material Types | Marble, dolomite |
Main performance indicators | Capacity:>18t/h; Product fineness: 250 mesh, 100% pass |
Main characteristics of the project | This project is an EP general contracting project, and our company is responsible for the overall engineering design, manufacturing, supply, and technical services of the 9000 MTM putty powder production line project. It covers the crushing and grinding of raw materials in the putty powder production line, the pneumatic conveying and transportation of semi-finished materials, the mixing system of semi-finished materials, and the packaging system of finished products. The biggest difficulty of this project is that the owner has extremely high requirements for the fineness of raw materials after grinding, requiring a 100% pass rate. After detailed technical argumentation and multiple rounds of technical exchanges, the owner has chosen our company to undertake the project. Currently, the project has been smoothly put into operation, and our advanced process flow, scientific and reasonable equipment selection, and highly responsible after-sales technical services have been highly recognized and praised by the owner. |