logo
Hefei Hengcheng Industrial Equipment Technology Co., Ltd
products
products
Home > products > Pneumatic Conveying Pump > PLC Control Pneumatic Conveying Bin Pump Thick Phase Conveying Equipment

PLC Control Pneumatic Conveying Bin Pump Thick Phase Conveying Equipment

Product Details

Place of Origin: China

Brand Name: Hengcheng

Certification: ISO Patent Certificate High-Tech Product Certificate

Model Number: PCD18/N PCD20/N PCD22/N PCD08/M PCD10/M PCD12/M PCD14/M

Payment & Shipping Terms

Minimum Order Quantity: 1 set

Price: Negotiable

Packaging Details: Standard shipping packaging

Delivery Time: 90 days

Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability: 5 sets\month

Get Best Price
Highlight:

Fly Ash Conveyor Bin Pump

,

PLC Control Pneumatic Conveying Bin Pump

,

Powder Pneumatic Conveyor Pump

Product Name:
Bin Pump Pneumatic Conveying
Applicable Industries:
Manufacturing Plant, Construction Works , Energy & Mining
Type:
Fly Ash Conveyor
Machinery Test Report:
Provided
Video Outgoing-inspection:
Provided
Core Components:
PLC
Material Feature:
Heat Resistant
Material Quality:
Cast Iron/Cast Steel/Stainless Steel
Product Specifications:
Complete Specifications
Conveying Materials:
Powder Material
Product Name:
Bin Pump Pneumatic Conveying
Applicable Industries:
Manufacturing Plant, Construction Works , Energy & Mining
Type:
Fly Ash Conveyor
Machinery Test Report:
Provided
Video Outgoing-inspection:
Provided
Core Components:
PLC
Material Feature:
Heat Resistant
Material Quality:
Cast Iron/Cast Steel/Stainless Steel
Product Specifications:
Complete Specifications
Conveying Materials:
Powder Material
PLC Control Pneumatic Conveying Bin Pump Thick Phase Conveying Equipment

Pneumatic Conveying Bin Pump PLC Control Thick Phase Conveying Equipment Pneumatic Conveyor Bin Pump

Product Introduction:

Introduction to conveying silo pump
The silo pneumatic conveying pump adopts a positive pressure pneumatic conveying method to transport powdered materials, and is widely used in the transportation of materials such as fly ash, cement, cement raw materials, mineral powder, etc. in power plants. The transportation pipeline can be flexibly arranged according to the terrain conditions, achieving centralized, dispersed, high altitude, and long-distance transportation. The transportation process is not affected by natural conditions, ensuring that materials are not affected by moisture and are environmentally friendly and pollution-free. This equipment adopts a PLC control system, which can be automatically or manually controlled. After long-term practical operation, it has been proven that the equipment has stable performance, reliable quality, and no dust pollution during transportation. It is an ideal pneumatic conveying equipment.

 

Seven advantages of bin conveyor pumps:
1. No pipe blockage
The pneumatic conveying bin pump can basically adapt to the pneumatic conveying of any powder material, and the system installed with the pneumatic conveying bin pump will not cause pipe blockage, with very high reliability. Even trying to artificially block pipes is a very difficult task.
2. Long distance pneumatic conveying
The bin pump can achieve ideal long-distance pneumatic conveying. Currently, in domestic cases, only the dense phase pneumatic conveying system operates stably with a conveying distance exceeding 2000 meters.
3. Low energy consumption
The conveying process of the warehouse pump only consists of three processes: feeding and pressurized conveying, omitting the step of pipeline blowing. The bin pump can achieve full pipe dense phase pneumatic conveying with low flow rate, and can stop conveying when there is no ash, which will not affect the next conveying process and will not block the pipe. The bin pump dense phase pneumatic conveying
4. Low wear and tear
Because the flow rate of the bin pump is low, wear is actually proportional to the flow rate. The pneumatic conveying flow rate of the bin pump generally does not exceed 5m/s. Many customers who are not familiar with it generally have high conveying pressure, which increases wear. In fact, the pressure of pneumatic conveying is not related to wear. The higher the conveying speed of the material, the more severe the wear will be.
5. High efficiency
We also do dilute phase pneumatic conveying, but we also have to admit that for the same conveying project, the conveying capacity of the warehouse pump can be more than twice that of the dilute phase pneumatic conveying.
6. Specific gravity
The dense phase pneumatic conveying adaptability of the bin pump is strong, and it can transport almost any powder
7. Simple configuration
The configuration of the warehouse pump is very simple, and modular components can save a lot of costs


Application Area
PCD pneumatic conveying equipment and systems have been widely used in industries such as building materials, chemicals, mining, power, and metallurgy. The conveying materials include cement, raw materials, fly ash, hydrated lime, dry discharged calcium carbide slag, slag powder, steel slag powder, coal powder, aluminum oxide powder, bauxite powder, phosphorus powder, pyrophyllite powder, and organic silicon powder.

 

Large Capacity Pneumatic Conveying Bin Pump Parameter Table

Conveying Material Bulk Density (t/m3) Model PCD24/H PCD26/H PCD28/H PCD30/H Conveying Distance
Specification 16~20m3 18~22m3 20~27m3 26~32m3 Level (m) Level (m)
Pulverized Coal 0.5 Delivery Volume (t/h) 50~80 60~90 65~110 80~130 200 20
Fly Ash 0.75 75~125 85~130 95~160 125~190 200 20
Limestone Powder/Mineral Powder 0.8 80~130 90~140 100~170 130~200 200 20
Cement/Raw Meal 1 100~150 115~175 130~215 165~260 200 20


Long-distance Pneumatic Conveying Bin Pump Parameter Table

Conveying Material Bulk Density (t/m3) Model PCD24/L PCD26/L PCD28/L PCD30/L Conveying Distance
Specification 16~20m3 18~22m3 20~27m3 26~32m3 Level (m) Level (m)
Pulverized Coal 0.5 Delivery Volume (t/h) 20~40 25~45 30~55 45~65 1000 25
Fly Ash 0.75 35~60 45~65 45~80 65~95 1000 25
Limestone Powder/Mineral Powder 0.8 40~65 45~70 50~85 70~100 1000 25
Cement/Raw Meal 1 50~80 55~90 65~110 90~120 1000 25
 

 

Conventional Grid Pneumatic Conveying Bin Pump Parameter Table

Conveying Material Bulk Density(t/m3) Model PCD18/N PCD20/N PCD20/N Reference Conveying Distance
Specification 5.0~6.7m3 7.0~10.0m3 10.0~15.0m3 Level (m) Vertical (m)
Pulverized Coal 0.5 Delivery Volume (t/h) 12~20 16~32 25~50 500 30
Fly Ash 0.75 18~32 25~48 35~70 50  
Limestone Powder/Mineral Powder 0.8 20~35 26~51 38~75 500 30
Cement/Raw Meal 1.0 24~42 32~65 48~95 500 30
Silicon Powder 1.2 28~50 40~75 55~115 500 30
 

 

Parameter Table Of Small Size Pneumatic Conveying Bunker Pump

Material Bulk Density(t/m3) Model PCD08/M PCD10/M PCD12/M PCD14/M Reference Conveying Distance
Specification 0.2~0.5m3 0.6~1.6m3 1.5~2.5m3 2.5~5.0m3 Level (m) Vertical (m)
Pulverized Coal 0.5 Delivery Volume (t/h) 0.5~1.8 1.5~5.5 5.0~9.0 8.0~18.0 100 20
Fly Ash 0.75 0.9~2.8 2.5~8.5 7.0~14.0 12.0~27.0 100 20
Limestone Powder/Mineral Powder 0.8 1.0~3.0 3.0~9.0 8.0~15.0 12.0~28.0 100 20
Cement/Raw Meal 1.0 1.2~3.5 3.5~11.5 10.0~18.0 16.0~36.0 100 20
Silicon Powder 1.2 1.5~4.0 4.5~13.5 12.0~20.0 19.0~43.0 100 20

 

PLC Control Pneumatic Conveying Bin Pump Thick Phase Conveying Equipment 0