Product Details
Place of Origin: CHINA
Brand Name: Hengcheng
Certification: ISO Patent Certificate High-Tech Product Certificate
Model Number: HVM1250 HVM1300 HVM1500 HVM1700 HVM1900 HVM2200 HVM2400 HVM2800
Payment & Shipping Terms
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Standard shipping packaging
Delivery Time: 90 days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 3 sets/month
Product Name: |
40 T/H Vertical Coal Mill |
Applicable Industries: |
Building Material Shops, Manufacturing Plant, Energy & Mining |
Type: |
Vertical Mill |
Core Components: |
PLC, Engine, Bearing, Gearbox, Motor, Pressure Vessel, Gear, Pump |
Machinery Test Report: |
Provided |
Dimension(L*W*H): |
According To Model |
Fineness: |
≤12% |
After-sales Service Provided: |
Engineers Available To Service Machinery Overseas |
Price: |
Negotiable |
Product Name: |
40 T/H Vertical Coal Mill |
Applicable Industries: |
Building Material Shops, Manufacturing Plant, Energy & Mining |
Type: |
Vertical Mill |
Core Components: |
PLC, Engine, Bearing, Gearbox, Motor, Pressure Vessel, Gear, Pump |
Machinery Test Report: |
Provided |
Dimension(L*W*H): |
According To Model |
Fineness: |
≤12% |
After-sales Service Provided: |
Engineers Available To Service Machinery Overseas |
Price: |
Negotiable |
Coal Vertical Mill 40 T/H Vertical Coal Mill Energy-Saving High Production Low Consumption Coal Mill
Product Introduction:
Vertical mill is an ideal large-scale grinding equipment widely used in industries such as cement, electricity, metallurgy, chemical industry, non-metallic minerals, etc. It integrates crushing, drying, grinding, and grading transportation, with high production efficiency. It can grind block, granular, and powdered raw materials into the required powder materials.
Product advantages
1. High grinding efficiency and low power consumption;
2. Low metal consumption per unit product;
3. The process flow is simple, and the functions of material grinding, drying, and powder selection are completed simultaneously;
4. Small footprint, compact layout, lightweight system equipment, and low investment in civil construction.
Process Introduction
1. The raw coal is sieved through a grid screen in the raw coal yard and falls onto a belt conveyor. After being removed by an electromagnetic iron remover, the belt conveyor sends the raw coal to the raw coal bin for storage.
2. After the pulverization system has been started, open the rod valve at the bottom of the raw coal bin, start the sealing metering tape to feed the coal vertical mill, and the raw coal enters the coal vertical mill for drying and grinding.
3. The hot air or cement production line exhaust gas from the hot air stove is drawn by the system fan and enters the coal vertical mill. After sufficient heat exchange with the raw coal being ground in the mill, the coal powder is picked up and sorted at the powder selection machine. Coarse coal powder with poor fineness is re ground on the grinding disc for grinding. Qualified coal powder is collected by the explosion-proof gas box pulse dust collector with the airflow and discharged into the coal powder bin through the grid wheel.
4. The impurities in the raw coal, such as some coal gangue, metal blocks, etc., are discharged from the mill through the air ring and slag discharge port.
Parameter Table of Coal Vertical Mill
Specification | HVM1250 | HVM1300 | HVM1500 | HVM1700 | HVM1900 | HVM2200 | HVM2400 | HVM2800 |
Grinding table median diameter(mm) | 1250 | 1300 | 1500 | 1700 | 1900 | 2200 | 2400 | 2800 |
Capacity(t/h) | 10-15 | 10-15 | 14-22 | 20-28 | 26-35 | 35-45 | 45-56 | 70-90 |
Coal Moisture(%) | <15 | |||||||
Coal Power Fineness(%) | R0.08=2-12 | |||||||
Coal Power Moisture(%) | ≤1 | |||||||
Main Motor Power(kw) | 110/132 | 160/185 | 220/250 | 315/355 | 400/450 | 450/500 | 560/630 | 900/1120 |
Vertical grinding machines are composed of grinding discs, grinding rollers, powder selection machines, pressurization devices, monitoring devices, transmission devices, water spraying systems, coarse powder external circulation systems, and other structures
1. Grinding disc: including guide ring, wind ring, material blocking ring, lining plate, disc body, scraper plate, and lifting device.
2. Grinding roller: The roller sleeve is a wear-resistant component that requires sufficient toughness and good wear resistance.
3. Powder selection machines can be divided into three categories: static, dynamic, and high-efficiency combination powder selection machines
4. Pressure device: hydraulic device, energy storage device.
5. Monitoring device: Rocker arm monitoring, vibration monitoring.
6. Transmission device: electric motor, reducer.
7. Water spray system: reduce temperature and stabilize material layer.
8. Coarse powder external circulation system: elevator.
Engineering Cases
Engineering Design and Equipment Manufacturing Supply of HVM2800M Vertical Pulverized Coal Preparation System
Processing material type: bituminous coal
Capacity: ≥ 80t/h
Product fineness: 200 mesh, 85% pass